The Iberian blackout of 28 April 2025 and frequency stability in power systems with high renewable energy source penetration: dynamics, comparisons, and policy implications

Michał Thlon, Andrzej Brożek

    Streszczenie
    The Iberian power system disturbance of 28 April 2025 exposed the vulnerability of converter-dominated
    systems with high renewable energy source (RES) penetration to rapid frequency decline and voltage–reactive
    instability. This paper reconstructs the second-by-second event sequence using publicly available waveform data,
    estimates system inertia using ROCOF-based and aggregate-unit methods, and examines the interaction between
    voltage-reactive stress and frequency response. Results show that the disturbance originated in the voltage/reactive
    domain through overvoltage-triggered disconnections, which amplified ΔP and accelerated frequency decay to
    a nadir of approximately 48.5 Hz. Estimated inertia was in the range of 2.21–2.71 s. The constrained operational
    time window, driven by voltage-reactive events, limited the effectiveness of UFLS and FCR services. Application
    of the Inertia Adequacy Index (IAI ≈ 0.11) and its voltage-aware extension (IAI-V ≈ 0.005) confirms that the
    voltage-reactive channel closed the operational window before frequency reserves could respond. Cross-event com
    parison with the UK 2019 and ERCOT 2021 blackouts demonstrates divergent initiation modes. The findings in
    dicate that inverter-dominated regions require harmonized grid-forming capabilities, locational VAR/FFR procurement, and enforceable inertia floors.
    Dostęp do pełnej wersji artykułu po zalogowaniu się na stronie.
    Roczniki starsze niż 2020 nie zawierają pełnych wersji .